Website of the ALADIN Consortium
Most recent articles
-
Local Team Managers (LTM) meetings with minutes
12 October 2020, by PatriciaLTM meetingDatePlaceMinutes 29th LTM meeting 5 October 2020 video-conference (after EWGLAM/SRNWP meetings) minutes 28th LTM meeting 31 March 2020 video-conference (besides ALADIN workshop) minutes 27th LTM meeting 1 October 2019 Sofia, Bulgaria (besides EWGLAM/SRNWP meetings) minutes 26th LTM meeting 2 April 2019 Madrid, Spain (besides ALADIN workshop) minutes 25th LTM meeting 2 October 2018 Salzbourg, Austria (besides EWGLAM/SRNWP meetings) minutes 24th LTM meeting 16 April 2018 (…) -
The Data Assimilation Core Program and DAsKIT
5 October 2020, by PatriciaDA coordinator position. The 22nd ALADIN General Assembly approved the creation of a 20% DA coordinator position in ALADIN to assist the ALADIN PM and the CSSI : with the coordination of the ALADIN DA starter countries with their DA activities; with the coordination of the basic kit DA core program (meetings, inquiries, reporting, follow up of the actions, link with HIRLAM, ...); with the elaboration of the ALADIN-HIRLAM common work plan for the DA basic kit core program. After being (…) -
Cycles
1 October 2020, by PatriciaHistory (reverse order) of the ALADIN cycles ALADIN cycle [1] with memorandum [2]available inMajor modifications introduced in the cyclebased on ARPEGE cyclePhasing team AL48T1 1st stage Oct-Dec 2020, with finalization steps in Jan-Feb 2021 see the plans prepared for the 29th LTM meeting CY48T1 Bochenek, Spaniel : tentative remote phasing AL48 Jan-April 2020 see the plans prepared for the 28th LTM meeting CY48 Ait Meziane, Sekula, Spaniel, Tsenova AL47T1 Nov-Dec 2019 see the plans (…) -
Calendar and deadlines
10 September 2020, by PatriciaSome important dates and deadlines in the convergence process: 15th September 2020: deadline for candidacy to the PM and the 3 CSC leaders positions 15th September 2020: deadline for signalling any legal issues with the MoU text (each Member should check with their legal advisers that the MoU text complied with the local laws) 22nd September: meeting of the High-Level group 24th September: meeting of the selection panel for AROME CSC leader 12th October: meeting of the selection panel for (…) -
ALABOBO2 archives
23 July 2020, by PatriciaDuring the LTM meeting in Belgrade, it was proposed to encourage the exchanges through alabodo2, when installing export versions. The messages sent to alabobo2 mailing list are archived since then (October 2015). Those who have access to MF network (MF internal connections or remote connections with "calculette" to cross the firewall), can consult the archives and benefit from a research tool using : http://listsympa.meteo.fr/sympa/info/alabobo2 (choose Archive in the left menu). You don’t (…) -
Documents adopted for the ALH Consortium
23 July 2020, by PatriciaThe ALADIN and HIRLAM Directors met on 26 of June for their 6th joint meeting. During this video-conference, in preparation for the single ALADIN-LACE-HIRLAM consortium, they adopted the following documents (versions finalized on 1st of July 2020 by the Convergence Working Group according to the GA-C decisions): draft MoU, GA-C version, June 2020 Strategy document, Management document, Selection procedure, Call for applications (4 positions: PM, 3 CSCs Leaders), Roadmap and risk analysis. (…) -
Call for application for the Management Group of the single ALH Consortium positions
23 July 2020, by PatriciaAfter some 30 years of cooperation, the ALADIN, LACE and HIRLAM Numerical Weather Prediction Consortia have decided to reinforce their collaboration. At the end of 2020, twenty-six European National Meteorological Services will become Members of a new, unified Consortium, under this Memorandum of Understanding – MoU covering the period 2021-2025. The Members have adopted an ambitious 2021-2025 Strategy outlining their objectives in meteorological and computer science for this time (…) -
26th ALADIn GA and 7th joint ALADIM GA - HIRLAM C, 26-27 November 2020
23 June 2020, by PatriciaThe meetings of the ALADIN and HIRLAM Directors should have taken place in Toulouse, after the EUMETNET & ECOMET Councils. All these meetings have been transformed into video-conferences. The schedule agreed during the June meetings is kept: Thursday 26 November morning: 26th ALADIN GA in parallel with the UWC C Thursday 26 November afternoon: LACE and HIRLAM Councils in parallel Friday 27 November morning: 7th joint ALADIN GA – HIRLAM C meeting signature of the (…) -
Policy Advisory Committee (PAC) meetings
11 June 2020, by PatriciaSince the 3rd MoU (November 2005), the governance of the ALADIN project is under the responsability of the General Assembly (GA) who designs the Policy Advisory Committee (PAC). The PAC meets before each GA [1] : the Minutes of the PAC meeting are one of the preparatory documents of the GA. See also the PAC’s Terms of reference in annex to MoU4. Since May 2013, it has been decided to have a back-to-back HAC/PAC with a joint HAC-PAC session. In May 2017, it was decided to move the PAC (…) -
Minutes of ARPEGE/IFS coordination meetings
15 May 2020, by PatriciaIFS/ARPEGE coordination video-conf, 23 March 2020 IFS/ARPEGE coordination video-conf, 29 November 2019 Minutes of IFS/ARPEGE coordination video-conf, July 4, 2019 Minutes of IFS/ARPEGE coordination meeting, March 8, 2019 Reading, UK Minutes of the IFS/ARPEGE coordination video-conf, January 29, 2019 Minutes of IFS/ARPEGE coordination video-conf, 25 September 20, 2018 Minutes of IFS/ARPEGE coordination video-conf, June 21, 2018 Minutes of IFS/ARPEGE coordination meeting, Toulouse, March 19, (…)
ALADIN