Home > User’s guide > 2. Overview of the externalized surface sequence

2. Overview of the externalized surface sequence

Latest update : 23 November 2011.

The externalized surface facilities do not contain only the program to run the physical surface schemes, but also those producing the initial surface fields (before the run) and the diagnostics (during or after the run). All these facilities are listed, below, and they separate in 4 main parts:

Articles in this section

  • 2.1. The sequence


| Site Map | Download in pdf format | Legal notices | Follow site activity RSS 2.0 | Top of the page | SPIP | ScolaSPIP
Surfex (CNRM)