A 36-point action plan for TT8 – to be completed by 14 August.

 

- an outcome of the TT8 core group meeting, University of Leeds, 7 July 2005.

 

 

 

Refinement and description of strategy

 

Priorities for deployment - URGENT

 

 

#

What

Who

Status

1

Modify objectives using ISP Key Questions

CF

 

2

Number tables

DP

 

3

Complete SOP dates / aircraft deployment table

CF

 

4

Add ground-based instruments to this

BP

 

5

Prepare a ‘global’ description of TT8 ground-based strategy

SC/CF/DP

 

6

IOP patterns (Ix):

·        Renumber, grouping surface-atmosphere patterns as I1.x.

·        Additional IOP pattern: THORPEX-style intensive regional observations, and possible targeted observations (DP)

·        Complete descriptions using discussions from Leeds

·        Bouniol = PI for I4.1, I4.2

·        Describe:

a)     Ground-based and aircraft cooperation

b)     Include timelines, including notification to radiosonde network and other ground-based instruments.

c)      Describe forecasting needs and real-time operational data needs.

d)     Satellite data and modelling links

e)     Recommendations for enhancement (e.g. if you had a radar at Niamey, how would it be used and how would it enhance the outcomes?)

Various

 

7

Remove 2.1.1

DP

 

8

Reorder IOP patterns in all tables

DP

 

9

Instruments and funding table: add all ‘responsive’ ground-based instruments.

DP/BP

 

10

Ix leaders check ‘stakeholders’ table

Various

 

11

Include Eric Mathieu’s Ix flight durations and numbers tables

DP

 

12

2.1.2 => ‘continuous monitoring strategy’ and moved before Ix descriptions

DP

 

13

Modelling and satellite obs:

·        Move before Ix

·        Extract details in summary from Ix and ground-based

·        Use AMMA-sat categories

·        Data assimilation

·        Targetting?

DP

 

14

Aircraft platforms and instruments – remove ‘and instr..’ And complete. Add Swiss Learjet.

DP/CF

 

15

Next A/C table – remove columns and merge remains with previous

DP

 

16

G-B table – divide according to SOP-only, EOP-additional and EOP-with-SOP-mode

SC

 

17

Include descriptions of specific g-b instrument operations

SC

 

18

Maps

SC

 

19

Ships

CF/DP

 

20

Decision-making – describe summary from Leeds. Relate to MAP, TROCCINOX …

DP

 

21

3.1.4 Check and add phenomena from Chemists

DP

 

22

Personnel table in 3.2:

·        Prepare new form and complete for A/C and g-b

Various

 

23

Composition of decision-making groups = UNRESOLVED

DP

 

24

G-B logistical requirements – to pass to ST2 (but not A/C)

SC

 

25

Guest A/C scientists

DP

 

26

Add TT2a/2b coordination and TC => ST

DP

 

27

Add appendices of a/c instruments

CR

 

28

Niamey radar – describe implications for Ix operations and science; also g-b strategy

DP/CF

 

29

Airborne soil moisture – what do we gain according to Ix?

DP/CF

 

30

Geophysica – ditto

CM

 

31

Role of Northern RS quadrilateral – missing stations?

DP/CF

 

32

Heat low fluxes – describe scientific significance

DP/CF

 

33

Don’t stop g-b aerosol/chem at Djougou during SOP-C

CM

 

34

Scientific exploitation of transits

DP/CF

 

35

Communication priorities:

·        Radar to AOC

·        Lidar network for I1.2

·        a/c data during/after flight

SC

 

36

Dropsondes on GTS!

DP

 

 

DP:     Doug Parker

CF:      Cyrille Flamant

CM:     Celine Mari

SC:     Susanne Crewell

CR:     Claire Reeves

BP:      Bernhard Pospichal

Other tasks:

 

Nominate PIs for the following proposals to enhance the implementation:

 

Niamey radar:                        Alain Protat

SMOS simulator:                   Jan Polcher, Chris Taylor, Patricia de Rosnay?

Geophysica:                          Hans Schlager, Kathy Law??

 

Short (1-page) proposals for the use of these facilities should be prepared by 22 August 2005, for discussion at the ISSC meeting in Paris.